Posted: 1st April 2022
Posted: 1st April 2022
Published by The Off-site Hub, ‘Unlocking brownfield sites for MMC’ is our article with insights from our specialists about using piled foundations to increase the viability of brownfield sites.
“With increasing demand to build on Brownfield sites, the use of piled foundations is rising. The higher costs of deep foundations reduce project viability for MMC however, there is a solution.”
In this piece, we discuss the downfalls of traditional deep foundations for MMC and the solutions for both frame and volumetric builds.
To read the article in full follow this link to the Off-Site Hub – Unlocking Brownfield sites for MMC.